With the broken bridge to the east, Albert Chung, a surveyor with Ranger Construction, uses GPS tools to determine the new road edge and drainage slope as part of the reconstruction of George Bush Boulevard. It’s scheduled to finish in summer 2023. J
broken bridge (3)
Businesses, church determined to press forward after construction on George Bush Boulevard first forced them to adapt
Profiles by Jane Smith and Rich Pollack
Photos by Tim Stepien/The Coastal Star
House Speaker Nancy Pelosi, visiting the George Bush Boulevard bridge in Delray Beach on March 19, told residents and reporters that about $19 billion has been set aside for infrastructure work in Florida as part of a bill Congress passed in late 202