With the North Atlantic Drive/Beach Curve drainage project complete, Lantana is prepared to begin paving the roads and doing additional drainage improvements on Hypoluxo Island.

At its Feb. 26 meeting, the town approved a contract with M&M Ashpalt Maintenance Inc. for the paving and drainage work on North Atlantic Drive, Beach Curve Road and Barefoot Lane from South Atlantic Drive to the Intracoastal Waterway in an amount not to exceed $269,999.

Work is to be completed within 120 days.

 – Mary Thurwachter

 

E-mail me when people leave their comments –

You need to be a member of The Coastal Star to add comments!

Join The Coastal Star

Activity Feed

The Coastal Star posted a discussion in DELRAY BEACH
33 minutes ago
The Coastal Star posted a blog post
34 minutes ago
The Coastal Star posted a discussion in BOCA RATON
yesterday
The Coastal Star posted a blog post
yesterday
The Coastal Star posted an event
May 4
The Coastal Star posted an event
May 4
The Coastal Star posted an event
May 4
The Coastal Star posted an event
May 4
The Coastal Star posted an event
May 4
The Coastal Star posted an event
May 4
The Coastal Star posted an event
May 4
The Coastal Star posted an event
May 4
The Coastal Star posted a discussion in SURF POCKET
Apr 30
The Coastal Star posted a blog post
Apr 30
The Coastal Star posted a discussion in ACROSS THE BRIDGE
Apr 29
The Coastal Star posted a discussion in DELRAY BEACH
Apr 29
The Coastal Star posted a discussion in BEACH WATCH
Apr 29
The Coastal Star posted a discussion in BEACH WATCH
Apr 29
The Coastal Star posted a discussion in HIGHLAND BEACH
Apr 29
The Coastal Star posted a discussion in BEACH WATCH
Apr 29
More…